Panchkula councillors raise civic issues, seek better infrastructure at first general house meeting
Published on: June 17, 2026, 6:28 a.m. | Source: Hindustan Times
During the meeting, officials informed the House that the corporation is planning to hire a consultant for a detailed study of the existing stormwater drainage system and preparation of a comprehensive drainage plan with both short-term and long-term measures at an estimated cost of ₹1 crore
